在线客服:1290940359
+发表新主题
查看: 522|回复: 0

粤电力A公告(英文版)

[复制链接]

粤电力A公告(英文版)

生活 发表于 2005-9-30 00:00:00 浏览:  522 回复:  0 [显示全部楼层] 复制链接

成为注册用户,每天转文章赚钱!

您需要 登录 才可以下载或查看,没有账号?立即注册

x
Stock Abbreviation: Yuedianli A, Yuedianli B; Stock Code: 000539, 200539 Announcement No.:Announcement of Guangdong Electric Power Development Co., Ltd.

The Company and its directors hereby guarantee that the content of information disclosure is real,accurate, complete and free from any false record, misleading representation or materialomissions.

#11 Unit (coal- fired unit with capacity of 0.3 million kw) of Shaoguan Power Plant

under Shaoguan Yuejiang Power Generation Co., Ltd. of which the Company holds

65% equity smoothly passed 168-hour full load trial run on July 22, 2005. The unit

has run in good condition and met the requirements of relevant regulations. According

to the decision of Unit Start Committee, the unit was handed over for commercialoperation on the same day. According to Yue Jia (2005) No. 94 Notice of Guangdong

Price Bureau, the on-grid electricity rate of this unit (not including desulfurationexpenses) is RMB 0.424/kwh (including tax), which will take effect as of the startingdate of the commercial operation of the unit. Its on-grid electricity rate including

desulfuration expense is RMB 0.439/kwh (including tax), which will take effect as ofthe starting date of the commercial operation of desulfuration equipment. After this

unit was put into production, the installed capacity of the Company for productionincreased from 3.285 million kw to 3.585 million kw.This announcement is hereby made.The Board of Directors of Guangdong Electric Power Development Co., Ltd.September 30, 2005
5e天资,互联天下资讯!
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则


QQ|手机版|手机版|小黑屋|5E天资 ( 粤ICP备2022122233号 )

GMT+8, 2025-5-6 01:29 , Processed in 0.181968 second(s), 47 queries .

Powered by 5etz

© 2016-现在   五E天资